Powerplant Starting System Test Activities

dc.contributor.authorÖzdemir, ?.A.
dc.contributor.authorEsen, C.
dc.contributor.authorYalç?nkaya, H.M.
dc.contributor.authorSertta?, Y.
dc.contributor.authorBayat, A.
dc.contributor.authorEzerta?, A.A.
dc.date.accessioned2026-08-13T14:17:24Z
dc.date.issued2024
dc.description.abstractThe paper presents the starting system assessment of the T-625 helicopter, a light utility multi-role aircraft designed by the Turkish Aerospace Helicopter Group. T-625 is powered by twin CTS800-4AT turboshaft engines developed by the Light Helicopter Turbine Engine Company (LHTEC). The turboshaft engines are governed by an advanced, redundant dual-channel full authority digital engine control (FADEC) system. Ground and flight tests were conducted to assess the system's reliability, encompassing battery start, cross-engine start, and ground cart start functionalities. Tests were conducted under various weather conditions to ensure robustness. Engine starting system integration to the T-625 helicopter was successfully demonstrated with both ground and flight test campaign considering engine installation and certification requirements. In conclusion, engine starting system is approved by the engine manufacturer.
dc.identifier.citationPresented at 50th European Rotorcraft Forum (ERF 2024), September 10-12, 2024, Marseille, France.
dc.identifier.urihttps://hdl.handle.net/20.500.11881/4614
dc.language.isoen
dc.titlePowerplant Starting System Test Activities

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
DocFinal-201.pdf
Size:
794.82 KB
Format:
Adobe Portable Document Format

Collections